Wärmebildkamera und Zubehör in 3 Losen (投標 №129779631cn)

請註冊

分享這個:
國家: Germany
語言: DE
數: 129779631
出版日期: 22-09-2025
源:

描述

有關招標的全部信息已關閉。
有關該站點的更多信息,請閱讀以下信息。

關於我們

俄羅斯和世界範圍內招標和採購的領先搜索引擎

  • 俄羅斯和世界上最大的招標和採購來源數據庫
  • 根據您的設置免費提供每日新聞
  • 您需要的格式的中標者信息
  • 方便顯示和上傳信息

選擇我們

入門

在站點上註冊,之後您可以使用以下站點功能:

  • 為您的關鍵短語訂閱免費郵件列表
  • 查看招標公告
  • 以Excel格式導出摘要信息
  • 查看有關標書的中標者,供應商和客戶的部分信息

登記表

要使用網站的所有功能並查看全部信息,您需要註冊一個商業帳戶

  • 選擇關稅
  • 以任何可能的方式付費進行訪問

完全訪問
Quotations are hereby invited to Supply, deliver & install network switch at NC Regional Office as per specifications. Please note that this quotation was published late. 源: ONLINE TENDERS

Quotations are hereby invited for the Removal of 10 hectares Persicaria senegalensis. Scope: 1. Removal of 10 hectares Persicaria senegalensis (rooted plants) at the Hartbeespoort dam (the plants are scattered around the shore of the dam); 2. The removal must be done using manual labour next to the shoreline and machinery can be used where the dam is a bit deep; 3. The service provider must have the required resources (machinery) to perform the work; 4. The removed plants must disposed according to the NEMA act, and plant disposal certificate must be provided after. Qty: 01. The project duration is 14 working days. Please note that this quotation was published late. 源: ONLINE TENDERS

Quotations are hereby invited for the appointment of a contractor for the application of slurry seal surfacing maintenance on roads within the rural areas of the client on an as and when required basis for a period of twelve (12) months. Scope of work: The activities which are to be executed by hand to include: • Employing the required safety measures (barrier tape, signs, cones a personnel) to warn motorists; • Provide personnel with required safety equipment and PPE; • Cleaning, sweeping, clearing and compacting of area for application; • Application of tack coat by brush; • Mixing of Slurry; • Placing of slurry and spreading with squeegees to required thickness (8-12 or 6- 8mm); • Each layer shall be opened for traffic only after it has cured and is capable of carrying traffic. The Surfaced area is then smoothed, and loose stones are removed by dragging the Hessian bags over the area. The surfaced areas should be closed off to traffic for at least 2 hours during a warm summer’s day or at least 4 hours, during Winter to allow for the product to dry; • Dispose of waste material at designated dumping site. 源: ONLINE TENDERS

CA16474 - RFQ 2025 23 - ICT Appointment Restoration Works to Newry Canal Lock No.6 源: gov.uk Contracts Finder

Construction Equipment Supplies - ANTHRO-PROC-MISC11 源: gov.uk Contracts Finder

Feuerwache Leverkusen - Akkutausch USV-Anlagen 源: eVergabe.de