19/ChWi-0058 PISA III ERN Charlottenburg-Wilmersdorf 2 (投標 №82807585cn)

請註冊

分享這個:
國家: Germany
語言: DE
數: 82807585
出版日期: 24-04-2023
源:

描述

有關招標的全部信息已關閉。
有關該站點的更多信息,請閱讀以下信息。

關於我們

俄羅斯和世界範圍內招標和採購的領先搜索引擎

  • 俄羅斯和世界上最大的招標和採購來源數據庫
  • 根據您的設置免費提供每日新聞
  • 您需要的格式的中標者信息
  • 方便顯示和上傳信息

選擇我們

入門

在站點上註冊,之後您可以使用以下站點功能:

  • 為您的關鍵短語訂閱免費郵件列表
  • 查看招標公告
  • 以Excel格式導出摘要信息
  • 查看有關標書的中標者,供應商和客戶的部分信息

登記表

要使用網站的所有功能並查看全部信息,您需要註冊一個商業帳戶

  • 選擇關稅
  • 以任何可能的方式付費進行訪問

完全訪問
Re-Advertisement: Tenders are hereby invited for the maintenance and service of plumbing, for a period of three years. The work will be done for the following systems/fittings categories: - Hot Water System shall include new installation, replacement, repairs and maintenance on the hot water reticulation system upstream of the pressure regulation valve, which shall include but not limited to, the pressure regulation valve; electrical hot water cylinder, all relevant valves and components and all hot water pipe and fittings and shall end at any of the relevant hot water terminal fittings. - Cold water system shall include new installation, replacement, repairs and maintenance on the cold water reticulation system upstream of the municipal metering valve, which shall include but not be limited to all relevant valves and components relating to the cold water system and all cold water pipe and fittings and shall end at any of the relevant cold water terminal fittings. - Sanitary-wave and sanitary fittings the sanitary-ware and sanitary fittings shall include new installation, replacement, repairs. - Solar water heating system. - The solar water heating system shall include new installation, replacement, repairs and maintenance on the solar water heating system which shall include, but not be limited to, hot water reticulations system upstream of the pressure regulation valve, the pressure relations valve, if applicable the electrical hot water cylinder, a solar (electrical) hot water cylinder, all relevant valves and components and all hot water pipe and fittings and shall end at any of the relevant hot water terminal fittings. - Below-ground drainage system shall include new installation, replacement, repairs and maintenance on the below drainage systems which shall include but not limited to floor drains, septic tank and French drains installations. - Above-ground drainage system shall include new installation, replacement, repairs and maintenance on the above-ground drainage systems which shall include but not limited to all internal and external waste water and soil drainage. - Rain water disposal system shall include new installation, replacement, repairs and maintenance on the above-ground drainage systems which shall include but not limited to storm water drainage, guttering and flashing. - Sewer lines-jetting of sewer-line and camera inspection. The cleaning or unblocking of sewer line (where plumbing rods are impractically) shall be done using the industrial jetting machines and where require the use of camera inspection will be requested from the service provider as per agreed work instruction/request. - Sewer suction services the service provider must be able to source the suction trucks for the removal of effluent sewer water due to plumbing or pump system failure. 源: ONLINE TENDERS

Quotations are hereby invited for the following: Provision of an internal audit manager for six months. Scope of work/supply: • Internal audit. • Manage internal Audit execution as per the Internal Audit Plan and conduct Ad hocs request. • Manage advocacy of Internal Audit, and make presentation to Exco, management forum and any other internal forum on the role of internal audit, audit output and audit report. • Keep abreast of changes in legislation and act in advisory capacity to communicate such. • Changes to management thereby creating awareness of the impact on the organisation. • Manage the Internal audit Function and review work performed by the team. • Ensure that work carried out is in accordance with the internal audit methodology and IIA standards. • Manage the Execution of the Internal Audit Plan. • Manage the planning phase input 3 year Internal Audit plan to define scope and budget requirements. • Produce Audit report, submit to Line Manager and present it to Exco. Prepare report for Audit and Risk Committee. • Prepare quarterly activity report and submit to Line Manager. • Prepare performance management contract on annual basis and perform PDP midterm. • Monitor compliance to policies. Monitor adherence to standard of Institute of Internal Auditors and prepare Internal Audit Charter submit it to Line Managers. 源: ONLINE TENDERS

Tenders are hereby invited for the sale of the following: Forklifts & Towing Trucks / Tractors - Bon Accord. 源: ONLINE TENDERS

Rohbau-, einschl. Erdbau-, Beton-, Beschichtungs-, Elektro- u. Sanitärinstallationsarbeiten nach div. Gewerken - 710/2023 源: eVergabe.de

Wartung von automatisierten Photometern (Tischgerät), Fabr. Thermo Fisher Scientific 源: eVergabe.de

Baumpflege in Tübingen 2023 源: eVergabe.de