Carrying out the installation of load cell and Spherical Washer arrangement at Row A (Furnace Front wall panel 8 No Support location) Row K (Furnace Rear wall panel 8 Nos Support location) in all respect at Boiler Unit-1 of 2X800MW NTPC Rama (投標 №102253462cn)