[Dismantling 30lbs track line in XVI(B) seam, transporting 60 Ibs track line from D- 17 TG and laying fitting of 30 an 60 lbs track line in 5th an 6th dip and rise from 2nd level to -2level and from 6th dip to ROK in 0 level of XVI(B) seam at MND.] (投標 №110130915cn)