[Day to day works related to dismantling,shifting, laying,fitting, commissioning, installation of pipelines/pumps in the mines for dewatering,tanker loading etc.as and when required basis for the period of365 days as per the direction ofEIC of LOCP,LA] (投標 №114429163cn)