Construction of Shopian Bypass on NH444 taking off from existing ch. Km 36.500 and rejoining at Km 47.588 of existing chainage New Design Chainage from Km 28.000 to Km 36.925 as 2lane with paved shoulder Length 8.925 Km in the UT of JandK on EPC Mode (投標 №99461147cn)