Bids are hereby invited for the following: Supply and install new hot water gas geysers and gas cylinders at Uilenkaalsmond Resort. Specifications: 1. The existing walls around the diesel tank to be removed. Two walls to be built: 8m long, 1.8m high, and 230mm wide – situated on the corners in the boiler room. A solid floor raised 5cm to be laid. A non-flammable roof fitted over. The electrical cable on the wall to be moved out the gas cage; 2. 3 x 1m lockable security gates to be installed to protect the gas cylinders; 3. Plumber to provide sufficient cold water to both geysers and isolate hot water pipe to the men’s and ladies’ ablution facilities. Men’s geyser installed in boiler room. Ladies’ geyser in the ladies disabled toilet, in a lockable box; 4. Provide an emergency backup power inverter to power both geysers for at least four hours. Connect power from the inverter to both geysers; 5. Replace block 1 and block 2 boiler room doors with secure louvered aluminum doors; 6. Repair boiler room roof, clean and paint room; 7. Provide 3 x 3 stainless steel manifold, HP auto changeover regulator, two high demand low pressure regulators, 20m pex pipe, valves and connectors as required to connect two geysers; 8. Provide 2 x 28L Class C internal gas water heaters; 9. Provide 6 x 48kg gas cylinders filled with LPG; 10. Have a fire plan drawing prepared for approval by the fire department before commencement of work; 11. Provide fire extinguisher required for gas fires and protective cover; 12. Display all relevant signs as required; 13. Issue a certificate of compliance on completion of work. (投標 №104108283cn)

請註冊

分享這個:
國家: South Africa
語言: EN
數: 104108283
出版日期: 08-05-2024
源:
通過申請結束: 4 天

描述

有關招標的全部信息已關閉。
有關該站點的更多信息,請閱讀以下信息。

關於我們

俄羅斯和世界範圍內招標和採購的領先搜索引擎

  • 俄羅斯和世界上最大的招標和採購來源數據庫
  • 根據您的設置免費提供每日新聞
  • 您需要的格式的中標者信息
  • 方便顯示和上傳信息

選擇我們

入門

在站點上註冊,之後您可以使用以下站點功能:

  • 為您的關鍵短語訂閱免費郵件列表
  • 查看招標公告
  • 以Excel格式導出摘要信息
  • 查看有關標書的中標者,供應商和客戶的部分信息

登記表

要使用網站的所有功能並查看全部信息,您需要註冊一個商業帳戶

  • 選擇關稅
  • 以任何可能的方式付費進行訪問

完全訪問
эрдэнэ сумын ЕБС-ИЙН ҮДИЙН ЦАЙНЫ ХҮНСНИЙ МАТЕРИАЛ 源: Төрийн худалдан авах ажиллагааны цахим систем

Provision of medical practitioner manpower 源: Tender Board - Kingdom of Bahrain

Supply of Leser Spares 源: Tender Board - Kingdom of Bahrain

三亚市崖州区住房和城乡建设局 -三亚市崖州区北岭村防护栏及路灯亮化工程-更正公告 源: www.ccgp-hainan.gov.cn

Breede Valley Municipality invites quotations from suitably qualifying suppliers (service providers) for the appointment of a Health and Safety Agent. Specifications: The successful company will be required to carry out the following actions, among others: • To always act in close consultation with Municipal Representatives; • To liaise with the Engineer in the drawing up of the HIRA for the designer as per Clause 6 (1) of the CRs; • To advise the Engineer, Designer, and other Consultants in respect of the OHS facets of the design; • To assist the Client in preparing the Project Specific Health and Safety Specification and HIRA for inclusion in the Tender document; • To attend meetings during both the Design and Construction phases as required by the Client; • To evaluate OHS plans provided with the tenders; • To evaluate and approve the successful tenderer’s OHS plan and to report on this to the Client and Engineer; • To assist the client in obtaining permits to work from the Department of Labour if required; • To liaise with the Engineer’s site staff and other consultants; • To visit site, attend site progress meetings and carry out audits on at least a monthly basis; • The site audit, covering both paperwork and site observations must be reported to the OHS Unit Manager as well as the Engineer and Contractor on the standard Departmental Audit form; • To visit site on a separate occasion, once a month, and observe and report on what is happening; • To review any changes in design either by the Engineer or the Contractor; • To ensure that the Principal Contractor is carrying out his OHS duties in respect of the co-contractors; • To maintain liaison with the Contractor being audited and inform him timeously of any infringements of the Act and Regulations; • To work with the Contractor to provide a close out report. To provide report on all audits: • Reviewing the Principal Contractor’s (PC) response to the Specification; • Checking all appointments for compliance with the provisions of the Act and the Regulations; • Reviewing the PC’s Health and Safety Plan for compliance with the Act, Regulations and Specification; • Check all available documentation for emergency planning; • Assessment of the PC’s hazard identification, risk assessment and mitigation measures; • Checking on site application of the OHS plan and noting unsafe working practices; • Presentation of reports and findings to Principal Contractor, Engineer and Client. Delivery period shall be within 7 working days from receiving an official order from the municipality. 源: ONLINE TENDERS

Re-Advertisement: Quotations are hereby invited for the appointment of contractor to lay new vinyl flooring library (block G) at the Durban University of Technology (DUT) ML Sultan Campus. The scope of work for the project includes, but is not limited to: • Remove the old carpet floor and discard to municipal dumping area, • Prepare the surface for installation of new vinyl flooring, • Install new vinyl flooring, • Install new skirting along the walls, • Remove and re install any fixed library book shelves. 源: ONLINE TENDERS