Quotations are hereby invited to manufacture, supply and install pipework at Central Cemetery. Project Overview: • This project involves the manufacture, supply and installation and replace of existing pipe connection to the Central Cemetery as well as the construction of a new manhole and break through and repair of the existing chambers. The construction will adhere to SANS (South African National Standards) requirements. • The removal of all pipe work on the existing 50mm connection and connect to the existing pipework. • Working pressure on the bulk connection 12 – 16 Kpa. • All existing infrastructure removed/damaged to be replaced. • All manufactured pipework will be inspected before installation. (投標 №117888422cn)