Quotations are hereby invited for the following: Follow up alien clearing on Erf 3627 in Hornlee - Total m² = 24 618. Specifications: • Immediate clearing and herbicide application to all stumps of alien invasive plants; • Evidence of dye on all stumps that require herbicide; • Appropriate cutting techniques i.e. stumps should be cut no higher than ankle height; • Neatly stacked branches in horizontal stacks along the contour of the slope not more than 1.5meters high; • Removal of all green waste including reeds, branches etc from the river to the Green dump site at Old Place at contractors own cost; • Provision of appropriate tools and equipment for team members; • Provision of an appropriate team size i.e. not less than 8 people; • Provision of appropriate PPE; • All litter to be removed from the site; • Ensuring that no fires are made on site; • The removal of all litter from the site. (投標 №80228423cn)

請註冊

分享這個:
國家: South Africa
語言: EN
數: 80228423
出版日期: 15-03-2023
源:

描述

有關招標的全部信息已關閉。
有關該站點的更多信息,請閱讀以下信息。

關於我們

俄羅斯和世界範圍內招標和採購的領先搜索引擎

  • 俄羅斯和世界上最大的招標和採購來源數據庫
  • 根據您的設置免費提供每日新聞
  • 您需要的格式的中標者信息
  • 方便顯示和上傳信息

選擇我們

入門

在站點上註冊,之後您可以使用以下站點功能:

  • 為您的關鍵短語訂閱免費郵件列表
  • 查看招標公告
  • 以Excel格式導出摘要信息
  • 查看有關標書的中標者,供應商和客戶的部分信息

登記表

要使用網站的所有功能並查看全部信息,您需要註冊一個商業帳戶

  • 選擇關稅
  • 以任何可能的方式付費進行訪問

完全訪問
Tenders are hereby invited for the appointment of a service provider for the provisioning of red-hat maintenance and support for the period of 5 years. 源: ONLINE TENDERS

Tenders are hereby invited for the appointment of a service provider for the provisioning of red-hat maintenance and support for the period of 5 years. 源: ONLINE TENDERS

Tenders are hereby invited for the appointment of a service provider for the provisioning of red-hat maintenance and support for the period of 5 years. 源: ONLINE TENDERS

Quotations are hereby invited for the following: Follow up alien clearing on Erf 3627 in Hornlee - Total m² = 24 618. Specifications: • Immediate clearing and herbicide application to all stumps of alien invasive plants; • Evidence of dye on all stumps that require herbicide; • Appropriate cutting techniques i.e. stumps should be cut no higher than ankle height; • Neatly stacked branches in horizontal stacks along the contour of the slope not more than 1.5meters high; • Removal of all green waste including reeds, branches etc from the river to the Green dump site at Old Place at contractors own cost; • Provision of appropriate tools and equipment for team members; • Provision of an appropriate team size i.e. not less than 8 people; • Provision of appropriate PPE; • All litter to be removed from the site; • Ensuring that no fires are made on site; • The removal of all litter from the site. 源: ONLINE TENDERS

Quotations are hereby invited for the following: Follow up alien clearing on Erf 3627 in Hornlee - Total m² = 24 618. Specifications: • Immediate clearing and herbicide application to all stumps of alien invasive plants; • Evidence of dye on all stumps that require herbicide; • Appropriate cutting techniques i.e. stumps should be cut no higher than ankle height; • Neatly stacked branches in horizontal stacks along the contour of the slope not more than 1.5meters high; • Removal of all green waste including reeds, branches etc from the river to the Green dump site at Old Place at contractors own cost; • Provision of appropriate tools and equipment for team members; • Provision of an appropriate team size i.e. not less than 8 people; • Provision of appropriate PPE; • All litter to be removed from the site; • Ensuring that no fires are made on site; • The removal of all litter from the site. 源: ONLINE TENDERS

Quotations are hereby invited for the following: Follow up alien clearing on Erf 3627 in Hornlee - Total m² = 24 618. Specifications: • Immediate clearing and herbicide application to all stumps of alien invasive plants; • Evidence of dye on all stumps that require herbicide; • Appropriate cutting techniques i.e. stumps should be cut no higher than ankle height; • Neatly stacked branches in horizontal stacks along the contour of the slope not more than 1.5meters high; • Removal of all green waste including reeds, branches etc from the river to the Green dump site at Old Place at contractors own cost; • Provision of appropriate tools and equipment for team members; • Provision of an appropriate team size i.e. not less than 8 people; • Provision of appropriate PPE; • All litter to be removed from the site; • Ensuring that no fires are made on site; • The removal of all litter from the site. 源: ONLINE TENDERS