Extension of closing date: Proposals are hereby invited for the following: Provision of rail infrastructure technical performance assessment and asset condition assessment for the coal line and major feeder lines in the North Corridor for a period of four (4) months. Scope: The following information will be provided to support the various phases of the Assessment: • Network diagrams reflecting traffic densities, permissible axle loadings, extent of electrification and voltage and train authorisation systems and type; • Where possible the age of the asset or last major upgrade will be provided; • Access to raw data from the measuring test coaches; • Major control centres and signal cabin locations; • Historical, current and forward-looking traffic data. (投標 №87748550cn)

請註冊

分享這個:
國家: South Africa
語言: EN
數: 87748550
出版日期: 20-07-2023
源:

描述

有關招標的全部信息已關閉。
有關該站點的更多信息,請閱讀以下信息。

關於我們

俄羅斯和世界範圍內招標和採購的領先搜索引擎

  • 俄羅斯和世界上最大的招標和採購來源數據庫
  • 根據您的設置免費提供每日新聞
  • 您需要的格式的中標者信息
  • 方便顯示和上傳信息

選擇我們

入門

在站點上註冊,之後您可以使用以下站點功能:

  • 為您的關鍵短語訂閱免費郵件列表
  • 查看招標公告
  • 以Excel格式導出摘要信息
  • 查看有關標書的中標者,供應商和客戶的部分信息

登記表

要使用網站的所有功能並查看全部信息,您需要註冊一個商業帳戶

  • 選擇關稅
  • 以任何可能的方式付費進行訪問

完全訪問
Auction for the rental and operation of advertising location on lamppost Nos 58 in Muharraq Governorate 源: Tender Board - Kingdom of Bahrain

Cleaning Services for some of Edamah properties 源: Tender Board - Kingdom of Bahrain

Internet Protocol Address Management (IPAM) 源: Tender Board - Kingdom of Bahrain

Quotations are hereby invited for the following: Provision of P02 - riggers and 90 ton crane hire for Transnet SOC Ltd operating as Transnet Port Terminals at the Port of Richards Bay. Scope: P02 - rigging and 90 ton crane hire x 1 Each. The supplier should perform work as follows: 1. Provide three rigging crews for 10 days (week days); 2. Provide cranes 90 tons for 3 days of weekdays; 3. The rigging crew is expected to work 18 hours a day; 4. Normal hours are from 07:00 – 16:00 (9 hours); 5. After 16:00 is overtime (9 hours); 6. Riggers will work 2 weekends within 10 days (from 06h00 to 18h00); 7. The contractor will be expected to conduct rigging studies and risk assessments before conducting any lifting; 8. The Contractor will be expected to ensure that all rigging equipment are certified (load tested) and properly inspected prior to using them as per the OHS Act of 1993; 9. Riggers must come with their own tools; 10. Tool must have a check list and test certificate; 11. The riggers will lift counter weights 16 ton, pull conveyor belt and install conveyor belt, remove 12 ton hoppers and remove and install conveyor system gearbox and Motors. NB. Any deviation from this scope should be authorized by TPT management before work can be carried out. Location of Service: Richards Bay DBT. 源: ONLINE TENDERS

Quotations are hereby invited for the following: Supply of aircon carrier split unit (Saldanha Transnet Terminal). Scope: 1. Air conditioner; type: split unit, air flow capacity: British Terminal Unit 60000, potential rating: 380 to 415 V, frequency: 50 HZ, number of phases: 3, mounting type: under-ceiling, special features: refrigerant R410A, outdoor unit: 38RN060119A; P/N: 42FTR0601 191, Carrie x 3 each; 2. Air conditioner; type: split unit, air flow capacity: British Terminal Unit 9000, potential rating: 230 V, frequency: 50 HZ, number of phases: 1, mounting type: wall, special features: refrigerant - R410A/0.67 kg, indoor unit: FOUS09/A, outdoor unit: FOUS09X/A x 3 each. Location of Service: Saldanha Transnet Terminal. Please confirm the closing date as two were published. Please note that this RFQ was published late. 源: ONLINE TENDERS

Extension of closing date: Proposals are hereby invited for the following: Import Coking Coal Rebuild Programme, HV galleries at the Dry Bulk Terminal Port of Richards Bay, for Transnet Soc Ltd operating as Transnet Port Terminals. 源: ONLINE TENDERS