Quotations are hereby invited for the appointment of an electrical contractor. Specifications: • Terminate 2 x 240mm² AI MV cable with tails on the bus-bars at Kabelkring 1 Mini Substation, excavate for a distance of 125m lay the cable and extend towards the boundary of Erf 1806; • Install 2 x 300 A 3Ø CB at the kiosk where the customer is to terminate his own cable; • The customer will run his own LV cable at the boundary. Cable work and trenching: • The material will be supplied by uMhlathuze Electricity. All cable trenches shall be dug by hand to receive the new cable. Cables shall be laid to uMhlathuze Electricity standards and the contractor shall make sure that they are installed correctly. Cables in the same trench shall be spaced and laid parallel and shall not cross over one another. Cable ducts shall be install where cables cross roads if necessary. Cable ducts through private drive-ways is the responsibility of the owners of properties and shall be for their accounts; • All trenches shall be backfilled in layers of 200mm and compacted. The top layer of soil shall be racked and all waste materials shall be removed from site; • All redundant cable shall be retrieved and great care shall be taken where plants have to be removed; • The plants shall be re-planted and the area shall be left in an acceptable state. Barricading: • All open holes and trenches shall be property barricaded with red and white danger tape. Terminations and joints; • The contractor shall make sure that all terminations are properly secured, where conductors are terminated to circuit breakers or energy meters with screw type terminals, the strands of the conductor shall be twisted together. If this is not possible the conductor end shall be soldered or a short crimping lug shall be crimped to the end of the conductor to secure a good connection. No bare conductor shall be visible once the conductor is secured. For larger size LV cables, a heat shrink sleeve shall be crimp over the connection point of the terminals. (投標 №91198402cn)