Formal written price quotations are hereby invited for the following: Grass cutting - Cambridge. Scope of Work: 1. The grass shall be mowed to a height of between 30 mm and 50 mm and removed; 2. The contractor shall be responsible for bailing or collection and disposal of all grass cuttings by machines; 3. Grass cuttings that are not baled shall be removed from the site in black bags and disposed of at a licenced disposal site; 4. The finished work shall provide a neat and evenly cut appearance with no isolated tufts of grass left remaining; 5. Protection of existing structures, Memorials and Tombstones. All existing structures shall be left in the same state found at the beginning of the contract. Any damages to structures caused during the grass mowing will be repaired or replaced at the costs of the Contractor. (投標 №96154853cn)

請註冊

分享這個:
國家: South Africa
語言: EN
數: 96154853
出版日期: 13-12-2023
源:

描述

有關招標的全部信息已關閉。
有關該站點的更多信息,請閱讀以下信息。

關於我們

俄羅斯和世界範圍內招標和採購的領先搜索引擎

  • 俄羅斯和世界上最大的招標和採購來源數據庫
  • 根據您的設置免費提供每日新聞
  • 您需要的格式的中標者信息
  • 方便顯示和上傳信息

選擇我們

入門

在站點上註冊,之後您可以使用以下站點功能:

  • 為您的關鍵短語訂閱免費郵件列表
  • 查看招標公告
  • 以Excel格式導出摘要信息
  • 查看有關標書的中標者,供應商和客戶的部分信息

登記表

要使用網站的所有功能並查看全部信息,您需要註冊一個商業帳戶

  • 選擇關稅
  • 以任何可能的方式付費進行訪問

完全訪問
Addendum: Amendment to document and extension of closing date: Bids are hereby invited for the appointment of a panel of part-time adjudicators for the Community Schemes Ombud Service for a period of three (3) years. Scope of work: The successful Part Time Adjudicators will, as and when required by the CSOS, be required to, inter alia do the following: • Adjudicate disputes on the papers, either virtually or physically. Preparing and issuing of Notices of Set down for all Adjudication hearings (e.g. MS Teams, Face-to-face); • Conduct Investigations in terms of Section 50 and 51 of the CSOS Act (e.g. conduct investigations, inspections, enter or inspect assets, records, or other documents as shall be required in terms of S51 of the CSOS Act); • Convert settlement agreements / proposals received from parties during final written submissions, into adjudication orders; • Draft enforcement orders; • Respond promptly to CSOS’ Legal Services in respect of appeals to adjudication orders; • Respond promptly to the Regional Ombud / Senior Manager: Dispute Resolution in respect of complaints, delays & queries; • Update the SharePoint dispute tracking system with all Section 50, Section 51 investigations, adjudication orders and enforcement orders; • Attend to the requests for the setting aside, variations and amendments of adjudication orders as per clause 25 and clause 32 of the CSOS Practice Directive for Dispute Resolution, 2019, as amended; • Comment on legislative amendments regarding adjudications; • Prepare and submit monthly performance reports to the Senior Manager: Dispute Resolution and Regional Ombud on the last business day of each consecutive month; • Conciliation of CSOS disputes within prescribed timeframes – facilitate conciliations and draft settlement agreements, conciliation reports and non-resolution certificates. 源: ONLINE TENDERS

Formal written price quotations are hereby invited for the provision of security services for a period of 60 days to BCMM, EL Waste Disposal Site/Roundhill - Berlin. Specifications: - Security Guard, Grade C, Shift: Mon - Sun: Day Shift (12 Hours) - BCMM, EL Waste Disposal Site/Roundhill - Berlin, Quantity: 4 x 60 days; - Security Guard, Grade C, Shift: Mon - Sun: Night Shift (12 Hours) - BCMM, EL Waste Disposal Site/Roundhill - Berlin, Quantity: 4 x 60 days; - Licensed firearm: 24 hours (2 per shift), Quantity: 04. 源: ONLINE TENDERS

Formal written price quotations are hereby invited for the following: Grass cutting - East Cemetery. Scope of Work: 1. The grass shall be mowed to a height of between 30 mm and 50 mm and removed; 2. The contractor shall be responsible for bailing or collection and disposal of all grass cuttings by machines; 3. Grass cuttings that are not baled shall be removed from the site in black bags and disposed of at a licenced disposal site; 4. The finished work shall provide a neat and evenly cut appearance with no isolated tufts of grass left remaining; 5. Protection of existing structures, Memorials and Tombstones. All existing structures shall be left in the same state found at the beginning of the contract. Any damages to structures caused during the grass mowing will be repaired or replaced at the costs of the Contractor. 源: ONLINE TENDERS

Bids are hereby invited for the following: Procurement of non-contracted medical consumables / supplies (pharmaceutical galenicals and powders) for the Port Elizabeth Medical Depot for a period of 12 months. 源: ONLINE TENDERS

Formal written price quotations are hereby invited for the following: Supply and delivery of frozen Mackerel for the aquarium animals. 源: ONLINE TENDERS

Bids are hereby invited for the following: Supply and delivery material and spares for painting and glazing workshop at Cecilia Makiwane Hospital (once off delivery). Specification for painting and glazing material: • Glazing; • Mirrors; • Paints. 源: ONLINE TENDERS