火災和技術最低: 招標、公共採購 2024




請註冊

分享這個:
只: 2
13 dec
Written quotations are hereby invited for the procurement of wood chopper for reduction of garden waste at the Phalaborwa landfill and to reduce the amount of fire incidents occurred in the previous financial year. Specifications: To process garden waste including branches, leaves, and other organic materials into mulch or compostable materials at the landfill: Technical specifications: Capacity: - Processing Capacity: Minimum 3 tons per hour, - Input Material Diameter: Up to 6 inches (150 mm), Engine: - Type: Diesel-powered (preferred) or electric, - Power Output: Minimum 50 HP, - Fuel Tank Capacity: Minimum 15 gallons for diesel engines, Chopping Mechanism: - Type: Drum or disc chipper, - Number of Blades: Minimum 4, with adjustable and replaceable options, - Blade Material: High-strength alloy steel or equivalent, - Feed Mechanism: Hydraulic or mechanical feed rollers, Safety Features: - Emergency Stop Button: Easily accessible, - Feed Control Bar: For safe operation, - Protective Shields: Around moving parts, - Safety Lockouts: For maintenance and repair, Operational Features: - Ease of Operation: Simple control panel with clear instructions: - Portability: Mounted on a trailer with appropriate DOT-approved lighting and hitching for transport, - Noise Level: Compliance with local noise regulations (preferably below 85 dB at operator position), - Dust Suppression: Integrated dust suppression system, Maintenance: - Service Accessibility: Easy access to engine and chopping mechanism for routine maintenance, - Tool Kit: Manufacturer-provided basic tool kit for maintenance, - Spare Parts Availability: Assurance of availability of spare parts for at least 10 years. Warranty and Support: - Warranty: Minimum 2-year warranty covering parts and labour. - Technical, Support: 24/7 customer support with onsite service options. Documentation: - User Manual: Detailed user manual in [language], - Maintenance Schedule: Recommended maintenance schedule, - Training: Onsite training for operators and maintenance staff. Delivery and Installation: - Lead Time: Maximum 60 days from the date of order, - Installation: Onsite installation and commissioning by the supplier. (EN) 添加到收藏夾
顧客: ONLINE TENDERS

數: 115986006

國家: South Africa

源: ONLINE TENDERS