Счетчик электроэнергии (投標 №80548369cn)

請註冊

分享這個:
國家: international
數: 80548369
出版日期: 19-03-2023
初始合同價格: 15 000
源:

描述

有關招標的全部信息已關閉。
有關該站點的更多信息,請閱讀以下信息。

關於我們

俄羅斯和世界範圍內招標和採購的領先搜索引擎

  • 俄羅斯和世界上最大的招標和採購來源數據庫
  • 根據您的設置免費提供每日新聞
  • 您需要的格式的中標者信息
  • 方便顯示和上傳信息

選擇我們

入門

在站點上註冊,之後您可以使用以下站點功能:

  • 為您的關鍵短語訂閱免費郵件列表
  • 查看招標公告
  • 以Excel格式導出摘要信息
  • 查看有關標書的中標者,供應商和客戶的部分信息

登記表

要使用網站的所有功能並查看全部信息,您需要註冊一個商業帳戶

  • 選擇關稅
  • 以任何可能的方式付費進行訪問

完全訪問
The City of uMhlathuze request quotations for the following: Enseleni Community Hall electricity upgrade; Qty: 1. Scope of Work: Reputable service provider are requested to carry out electricity upgrade from 230v, Single phase to 400v, 3 as follows: a) Supply and install new supply cable from the boundary up to the Main distribution board; b) Replace existing Main distribution board with a new one (Single line diagram will be provided on the site briefing); c) Swing both single phase cables feeding guard houses; d) Connect all electrical circuit’s to the newly installed Main distribution board as per single line diagram ensuring that the load is balanced between the three phases; e) Label the entire installation in terms SANS 104142 - 1; f) On completion carry out electrical installation test in terms of the latest revision of SANS 101042 -1 (Rev 3 of 2020) and issue the certificate of compliance; g) Provide as built drawings for the entire installation including 2 x sub distribution boards and cable. 源: ONLINE TENDERS

The City of uMhlathuze request quotations for the following: Enseleni Community Hall electricity upgrade; Qty: 1. Scope of Work: Reputable service provider are requested to carry out electricity upgrade from 230v, Single phase to 400v, 3 as follows: a) Supply and install new supply cable from the boundary up to the Main distribution board; b) Replace existing Main distribution board with a new one (Single line diagram will be provided on the site briefing); c) Swing both single phase cables feeding guard houses; d) Connect all electrical circuit’s to the newly installed Main distribution board as per single line diagram ensuring that the load is balanced between the three phases; e) Label the entire installation in terms SANS 104142 - 1; f) On completion carry out electrical installation test in terms of the latest revision of SANS 101042 -1 (Rev 3 of 2020) and issue the certificate of compliance; g) Provide as built drawings for the entire installation including 2 x sub distribution boards and cable. 源: ONLINE TENDERS

Dental Chair 源: Made-in-china

Dental Chair 源: Made-in-china

"Qarshi tumani Beshkent shahrida joylashgan "Beshkent markaziy o"yingohi" bino va inshoatlarini ta"mirlash ishlari (2-bosqich)" 源: ЭЛЕКТРОННАЯ ТЕНДЕРНАЯ ПЛАТФОРМА ПРОВЕДЕНИЯ ГОСЗАКУПОК В СФЕРЕ СТРОИТЕЛЬСТВЕ

"Qarshi tumani Beshkent shahrida joylashgan "Beshkent markaziy o"yingohi" bino va inshoatlarini ta"mirlash ishlari (2-bosqich)" 源: ЭЛЕКТРОННАЯ ТЕНДЕРНАЯ ПЛАТФОРМА ПРОВЕДЕНИЯ ГОСЗАКУПОК В СФЕРЕ СТРОИТЕЛЬСТВЕ