在火門上: 招標、公共採購 2025. 頁 № 7




請註冊

分享這個:
只: 561
07 jun
Fire Doors Replacement Works 2024 (EN) 添加到收藏夾
初始合同價格: 29 753 942 (CNY)
原始金額: 3 750 000 (GBP)

顧客: Flagship Housing Group

數: 105685725

國家: United Kingdom

源: gov.uk Contracts Finder

01 jun

數: 105325648

國家: Canada

源: RFQ

17 may
NCC1060 Concordia Fire Doors Replacement Scheme (EN) 添加到收藏夾
初始合同價格: 1 237 764 (CNY)
原始金額: 156 000 (GBP)

顧客: Northumberland County Council

數: 104595880

國家: United Kingdom

源: gov.uk Contracts Finder

16 may
REPAIRS TO FIRE EXIT DOORS TO MAIN BUILDING AT IISER PUNE (EN) 添加到收藏夾
顧客: Central public Procurement portal India

數: 104480946

國家: India

源: Central public Procurement portal India

15 may

數: 104367812

國家: South Africa

源: SA-Tenders

10 may

數: 104184139

源: RFQ

08 may
Bids are hereby invited for the following: Supply and install new hot water gas geysers and gas cylinders at Uilenkaalsmond Resort. Specifications: 1. The existing walls around the diesel tank to be removed. Two walls to be built: 8m long, 1.8m high, and 230mm wide – situated on the corners in the boiler room. A solid floor raised 5cm to be laid. A non-flammable roof fitted over. The electrical cable on the wall to be moved out the gas cage; 2. 3 x 1m lockable security gates to be installed to protect the gas cylinders; 3. Plumber to provide sufficient cold water to both geysers and isolate hot water pipe to the men’s and ladies’ ablution facilities. Men’s geyser installed in boiler room. Ladies’ geyser in the ladies disabled toilet, in a lockable box; 4. Provide an emergency backup power inverter to power both geysers for at least four hours. Connect power from the inverter to both geysers; 5. Replace block 1 and block 2 boiler room doors with secure louvered aluminum doors; 6. Repair boiler room roof, clean and paint room; 7. Provide 3 x 3 stainless steel manifold, HP auto changeover regulator, two high demand low pressure regulators, 20m pex pipe, valves and connectors as required to connect two geysers; 8. Provide 2 x 28L Class C internal gas water heaters; 9. Provide 6 x 48kg gas cylinders filled with LPG; 10. Have a fire plan drawing prepared for approval by the fire department before commencement of work; 11. Provide fire extinguisher required for gas fires and protective cover; 12. Display all relevant signs as required; 13. Issue a certificate of compliance on completion of work. (EN) 添加到收藏夾
顧客: ONLINE TENDERS

數: 104108283

國家: South Africa

源: ONLINE TENDERS