論設計與調查工作: South Africa 招標、公共採購 2024




請註冊

分享這個:
只: 8
30 aug
Re-advertisement of contract number: Q07-2024-25. Quotations are hereby invited for the following: Appoint a consultant to render environmental services at city landfill sites for the Environment and Agriculture Management Department. Scope of works: The professional services and scope required comprise of disciplines from Environmental Management, Geohydrologist"s and related studies. The consultant will be required to perform, amongst others, the following duties: 1. Water Quality and Leachate Monitoring: a. Bi-annual groundwater and surface water monitoring as described in the Minimum Requirements issued by the Department of Water and Environmental Affairs (DWEA), should be conducted at the end of the dry (September) and wet (April) seasons respectively, b. Reports on the existing groundwater and leachate monitoring must be submitted after each monitoring period and the report will be submitted to DWA, GDARD and the City within 30 days from the date on which the consultant finalized the assessment, c. Study all existing sampling reports to build up a continuous trend of current as well as future results relating to the ground water, surface water and leachate monitoring, d. Provide recommendations on additional borehole requirements as well as leachate monitoring systems at all landfill sites, e. Each individual sites should be reported separately in terms of the following main points: Number and condition of monitoring points, Ground and surface water chemistry, Recommendations for further work, 10 x Hard copies of the report required, Electronic version (on USB X10) of report required, 2. Air Quality Monitoring: a) Conduct an investigation on the dispersion of landfill gas (methane, VOC, H2S), landfill odour, dust and other air quality variables: • Samplers for Methane, VOC, H2S (8 samples for each gas per site), • Dust monitoring (to cover 8 sampling points per landfill site) to be conducted twice per year for 30 days each cycle, b) Provide recommendations to be taken to address these nuisances, c) Reports on the air quality monitoring will be submitted to GDARD and the City within 30 days from the date on which the external auditor finalized the assessment, d) Each individual sites should be reported separately in terms of the following main points: Number and condition of monitoring points, Air quality chemistry and dispersion model and trends, Recommendations for improvement, 10 x Hard copies of the report required, Electronic version (on USB x10) of report required, 3. Airspace Assessment: a. Compile the waste volume survey and project the remaining useful lifespan for each site, b. Present data on the type of waste disposed per site and the footprint of the area turned versus the remaining undeveloped cells per landfill site, c. Present the airspace assessment for each site under study and indicate the expected year of decommissioning for each site, d. Present the topographical surveys as well as the electronic models and drawings illustrating the design layout of the permitted future shape of the landfill site, e. Provide detailed report on landfill buffer zone encroachment and schematic presentation of the areas affected, f. Reports on the airspace assessment must be submitted to the City within 30 days and it will be submitted to GDARD from the date on which the consultant finalized the assessment, g. Each individual sites should be reported separately and copies of the report must be provided as follows: 10 x Hard Copies of the report required, Electronic version (on USB x10) of report required, 4. Landfill Provision: a. Compile a landfill provision report with calculations for the City’s ten (10) landfill sites, b. Report must contain provisioning for present and future value liabilities for rehabilitation, maintenance and monitoring of the sites under survey, c. Landfill provisioning report to be prepared for the financial year in review (2023/24), d. Reports on the landfill provision quantum will be reviewed by AGSA during 2023/24 audit cycle, e. Each individual sites should be reported separately, and copies of the report must be provided as follows: 10 x Hard Copies of the report required, Electronic version (on USB x10) of report required, 5. Environmental Audits: a. Compile an audit report documenting the findings of the audit, b. Establish whether the conditions of the permit are adhered to, c. Specify non-compliances identified and rectified prior to the audit, d. Interpretation of all available data regarding the operation of the facility, e. Present monitoring data graphically and outline trend analysis variations, f. Specify target dates for the implementation of the recommendations to achieve compliance, g. Reports on the external environmental audit must be submitted to the City within 30 days and it will be submitted to GDARD, h. Each individual sites should be reported separately, and copies of the report must be provided as follows: Hard Copies of the report required, Electronic version (on USB x10) of report required. (EN) 添加到收藏夾
顧客: ONLINE TENDERS

數: 110064264

國家: South Africa

源: ONLINE TENDERS

17 oct
Quotations are hereby invited for the following: Procurement of employee engagement survey services. Specifications: - This is a once-off survey, it aims at engaging employees online and anonymous in order to improve work culture and increase productivity. - Highest levels of data security and confidentiality. - Flexibility in reporting. - Mobile compatible. - Supplier will be required to meet with the NHC management upon appointment. - The service provider shall submit at least three (3) reference letters from contactable clients for which similar services were provided. The letters must be on the client letterhead with the company information such as address and telephone number, contact person, type of services rendered, the period that the services were rendered and the Rand value (Vat inclusive). - NHC staff compliment is currently at 50. - The service provider is required to design a survey that must make provision for, but not limited to, the following aspects: a) Do you find your work for NHC meaningful? b) How satisfied are you working for the NHC? c) Does NHCs vision and values inspire you? d) Do other provide you with recognition for your accomplishments at work? e) Do you feel like your supervisor is invested in your success? f) Do you receive recognition for your work? g) Do you feel valued and appreciated at work? h) Do you feel that there are professional development opportunities available to you? i) Do you plan to stay with the NHC for another 2 / 5 / longer years? j) Would you recommend NHC as a good place to work? k) In the last six months, someone at work has talked to me about my progress l) People in my department communicate sufficiently with one another. m) It is easy to get along with my colleagues n) Is there a sense of equality and fairness in the NHC? The service provider must analyse the information obtained from the survey and provide a report to NHC on the analysis of the data, including how critical aspects can be treated to enhance staff motivation or to address the concerns raised in the survey. (EN) 添加到收藏夾
顧客: ONLINE TENDERS

數: 92664177

國家: South Africa

源: ONLINE TENDERS